Orlando international airport bp-352 rehab of taxiways e & f

Orlando, FL

This project had many challenges. Moving labor, equipment and materials while maintaining restricted access and not affecting the safety or operation of the facility is a major concern requiring constant communication and coordination with airport operations. Due to the unique pavement loading of active airport taxiways and runways, Quality Control and Quality Assurance are of critical importance to a successful and long lasting final product. The installation of airport lighting and communication and integration into the existing facilities is required. This work must be performed without affecting the operation of the existing system. Often very narrow windows of time are available to complete this work.

PROJECT HIGHLIGHTS

  • $14.5M project
  • Clearing, earthwork, drainage and paving
  • Electrical work
  • Signage and pavement markings for widening and reconstruction of taxiways
  • Placement of an asphalt rubber membrane interlayer
Follow us:

Related Projects

Walt Disney World

HNW Construction Company has been a major contractor for the world’s most popular amusement / theme park complex. Since the beginning, HNW has helped make Walt Disney world what it is today, starting with the excavation of Bay Lake and doing the sitework and foundations for the Walt Disney monorail.

View details
Walt Disney World

Port Fernandina, Jackonville, FL

This project had many challenges. Moving labor, equipment and materials while maintaining restricted access and not affecting the safety or operation of the facility is a major concern requiring constant

View details
Port Fernandina, Jackonville, FL

Fdot district 4’s sr-9/i-95 broward express lanes

This project is a $112M Design-Build project that includes the design and construction of limited access, managed lanes by converting the existing High Occupancy Vehicle (HOV) Lane into 2 Express Lanes along I-95 from a point north of the SR 826 Golden Glades Interchange to a point south of the Broward Boulevard Park & Ride in both

View details
Fdot district 4’s sr-9/i-95 broward express lanes