Fdot district 4’s sr-9/i-95 broward express lanes

Miami-Dade and Broward Counties, Las Vegas

This project is a $112M Design-Build project that includes the design and construction of limited access, managed lanes by converting the existing High Occupancy Vehicle (HOV) Lane into 2 Express Lanes along I-95 from a point north of the SR 826 Golden Glades Interchange to a point south of the Broward Boulevard Park & Ride in both Miami-Dade and Broward Counties. Other aspects of the project include analyzing and designing all roadway and structural elements in addition to, but not limited to drainage, stormwater management, traffic control, permitting, utility coordination, lighting, Intelligent Transportation Systems (ITS) infrastructure, tolling infrastructure, survey, geotechnical investigation, signing, pavement markings and FHWA re-evaluations.

PROJECT HIGHLIGHTS

  • Traffic control for congested area
  • Limited lane closures and limited work space
  • Maintaining and installing new fiber-optic backbone
  • Avoidance of utility conflicts
  • Innovative foundation solutions for proposed light poles and sign structures.
  • Existing infrastructure re-used whenever possible provided cost savings
  • Coordination and creative engineering led to a redesign to avoid utility relocations – saving project time and money.
Follow us:

Related projects

Walt Disney World

HNW Construction Company has been a major contractor for the world’s most popular amusement / theme park complex. Since the beginning, HNW has helped make Walt Disney world what it is today, starting with the excavation of Bay Lake and doing the sitework and foundations for the Walt Disney monorail.

View details
Walt Disney World

Port Fernandina, Jackonville, FL

This project had many challenges. Moving labor, equipment and materials while maintaining restricted access and not affecting the safety or operation of the facility is a major concern requiring constant

View details
Port Fernandina, Jackonville, FL

Orlando international airport bp-352 rehab of taxiways e & f

Quality Control and Quality Assurance are of critical importance to a successful and long lasting final product.

View details
Orlando international airport bp-352 rehab of taxiways e & f